Police Scotland

Police Scotland Case Study
West & Central Scotland Portfolio Case Study
Police Scotland - West & Central Scotland Sites (Boilers)
Police Scotland - logo

OVERVIEW

ECG Facilities Services were delighted to be awarded the contract to upgrade the heating systems in nine of Police Scotland Offices at various locations throughout the West and Central Scotland from Oban to Lockerbie, including the prestigious Tulliallan Police College. The works involved the strip out of the existing boilers and associated plant including the strip out and replacement of oil storage tanks in Oban and Lochgilphead. ECG also arranged the installation of 500kW temporary boiler plant at Kilmarnock Police Office prior to any strip out works commencing due to the requirement for the Police Office to remain fully functional at all times with occupied cells during the course of the works. The new installations included the fitting of new gas- and oil-fired high efficiency and condensing boilers, along with new stainless steel flue systems. Modifications were undertaken to the existing gas pipework systems to incorporate the Medem gas proving and detection systems, and a complete new controls installation with full BMS capabilities, including data linkage back to Police Scotland’s Headquarters, was provided. All works were carried out on time, within budget and to the highest professional standards – much to the delight of the Client

BACKGROUND

Formally established in early 2013, Police Scotland are responsible for the policing across the length and breadth of Scotland. With 13 local policing divisions, each area is responsive, accountable and tailored to meet each local area’s needs.

SERVICES DELIVERED

Strip out of existing gas-fired boiler plant, together with redundant flues, pumps and pipework