OVERVIEW

After an intensive tendering process, Hanover Housing Association awarded ECG Facilities Services the contract to carry out the Gas Heating Upgrades at their sites in Barrhead, Elderslie, Drumchapel, Hamilton and Paisley. ECG removed the existing boilers, flues, pumps, and associated equipment from site – retaining the existing plate heat exchanger for integration into the new heating systems wherever possible. Our organisation provided temporary boiler plant facilities to ensure the residents experienced no interruption to their heating services, something which was vital due to the nature of these sites. The new boiler installations also included complete TRV replacements, new VT and CT pump sets, associated heating controls, new LTHW pipework and stainless steel flues to suit the boiler configuration. All works were delivered within a live working building, and ECG worked closely with Hanover’s staff to ensure noise levels were kept to a minimum to avoid disruption of the normal daily routines of the tenants as well as carrying out all works during the summer months, further minimising any potential inconvenience caused to the residents.

BACKGROUND

Hanover provide affordable homes and services, designed exclusively for people aged 55 and over. Currently managing over 19,000 properties in over 600 locations, Hanover offer residents 24-hour access to care on-site.

SERVICES DELIVERED

Installation of new heating outlet radiators in all flats, inclusive of TRVs;
Removal of redundant boilers and associated plant and equipment from site
Installation of new boilers and associated equipment
Upgrade of existing boiler house lighting
Installation of new McDonald water heaters in all flats and common area
Installation of new electric fires and hearths in flats